Demolish & Rebuild in Wellington

Sometimes the smartest investment is to start again. When a home has reached the end of its practical life (whether due to earthquake damage, severe weathertightness failure, or simply decades of deferred maintenance), a demolish and rebuild gives you a brand-new home on a site you already love.

At EBUILD, we manage the full process from the initial feasibility assessment right through to your new home handover. That includes demolition consents, hazardous material surveys (including asbestos testing), site clearance, earthworks, and the complete new build. You deal with one team, one point of accountability, and one fixed-price contract.

Get Started Today

Your dream home starts with a conversation. Call or email us to begin planning your project.

When Does a Demolish & Rebuild Make Sense?

A full rebuild is often the better path when:

What About the Existing Structure?

Why Choose EBUILD for Your Demolish & Rebuild

The "Total Accountability" Guarantee

We offer the independent Halo 10-Year Residential Guarantee for structural peace of mind. We also back this with Tony Hodson’s personal workmanship guarantee. We stand by our work long after handover. We do not make excuses. We fix any issues promptly because we value our reputation.

Frequently Asked Questions

Demolition typically costs $20,000 to $50,000 depending on the size of the structure, site access, and whether asbestos is present. The new build cost depends on your design and specifications. We provide a combined feasibility estimate during our initial site assessment so you can compare the full cost against a renovation.
In most cases, demolition of a residential dwelling in Wellington does not require Resource Consent, only a Building Consent for the demolition work itself. However, if your property is in a heritage area, contains a listed building, or requires significant earthworks, additional consents may apply. We check all of this during feasibility.
A typical demolish and rebuild takes 12 to 18 months from initial feasibility to move-in. Demolition and site preparation usually takes 4 to 6 weeks once consents are issued. The new build timeline depends on the complexity of your design.
We commission a licensed assessor to conduct a full asbestos survey before any demolition work begins. If asbestos is found, licensed removal contractors manage it in accordance with WorkSafe NZ regulations. This is factored into your demolition cost estimate upfront.
No. You will need alternative accommodation from the point of demolition through to handover of the new build. We can advise on typical timelines so you can plan accordingly.